Supply and installation of the following HVAC systems:

  • Preparing Builder work drawings 
  • Preparing Shop drawings 
  • Preparing Coordination drawings 
  • Preparing construction drawings 
  • HVAC Ducting works 
  • Sound Attenuation 
  • Chilled Water Pipe Installation 
  • Installation of Exhaust Fans 
  • Installation of Chillers, AHU’s, FCU’s, FAHU’s 
  • Installation of Package Units 
  • Installation of all Ducted Split Units 
  • Installation of VRF System 
  • Valve Package for AHU’s, Chillers, FCU’s & Pumps 
  • Installation of CHW pumps / Chemical Dosing Unit / Pressurization Units / 
  • Installation of VCD/FD/NRD/Split Dampers  Aluminum Cladding Works (Pipe & Duct)
  • CHW Pipe Pressure Testing 
  • Refrigerant Piping Works 
  • Air Terminals Installation 
  • Thermostat and Controllers 
  • Air Balancing 
  • Building Management System 
  • Testing and commissioning 
  • Approval Process from Authorities. 
  • As Built Drawings 
  • Operation and Maintenance Manual